EE'S WERE LIFTING A BAR TO BE INSTALLED INTO THEPRIMARY CRUSHER UNDERGROUND USING A CHAIN AND THE SCALER. THE SCALER OPERATOR WAS INSTRUCTED TO BOOM DOWN TO CREATE MORE SLACK IN THE CHAIN ALLO WING THE CHAIN TO BE TIGHTENED SLIGHTLY AROUND THE BAR. THE SCALER HAS A FLOATATION VALVE THAT RELEASED BELOW A CERTAIN ELEVATION ALLOWING BOOMTO GO TO FLOOR. CAUGHT EE HAND BETWEEN BAR& BOOM