TO CORRECT THE HAZARD OVER THE PORTAL AREA OF MINE #2 AT COOLSPRING QUARRY: FIRST AS ACCESS ROAD WILL BE CONSTRUCTED FROM THE PRESENT BACK FILLED AREA TO OBTAIN ACCESS TO BENCH AREA ""A"". THEN ONCE SAFE ACCESS IS OBTAINED BY USE OF A DOZER & EXCAVATOR, A MINIMUM OF 50 TO 100 FEET WIDTH WILL BE CLEARED OF THE MATERIAL THAT HAS FAILED. WE WILL LEAVE MATERIAL AGAINST BACK WALL FOR SUPP