OPERATOR WAS INSPECTING #7 BOILER FOR SLAG. TO DO THIS SHE USED INSPECTION PORT (D) WEST. THE BOILER DRAFT WENT POSITIVE, CAUSING HIGH TEMPERATURE GASSES TO EXIT THE INSPECTION PORT. THIS RESU LTED IN A BURN TO HER LEFT ARM, AND SINGEING OF HER EYELASHES AND HER HAIR.