A ROOF FALL OCCURRED IN THE BREAK BETWEEN #1 & #2 ENTRIES IN 2 LEFT MAINS ACROSS FROM #5 BELT, APPROX. 8'HIGH X 50'LONG. CRIBS AND 10'ROPE BOLTS WERE INSTALLED IN ADJACENT ROADWAY TO PROTECT IT IN THIS FAULTY AREA. 6'TORQUE TENSION BOLTS WERE ORIGINALLY INSTALLED. FALL WAS IN BREAK TO THE LEFT OF SPAD #3973.