A FALL OF GROUND OCCURRED ON AFTERNOON SHIFT ON TUESDAY JUNE 3, 2003. THE AREA WAS ON THE 4900 LEVEL DRIFT GOING BACK TO 49-76 RAISE. THE GROUND FALL MEASURED APPROXIMATELY 30' LONG 9' WIDE AN D 7' HIGH. REPAIR OF THE AREA IS BEING DONE ON TWO SHIFTS WITH DEWY DAG AND POINT ANCHOR BOLTS. TIMBER WILL ALSO BE INSTALLED IN THE AREA. ESTIMATED TIME TO REPAIR- TWO WEEKS.