THE HOIST LOST POWER AND THE MINE WAS EVACUATED. THE POWER OUTAGE WAS DUE TO AN ELECTRICAL PROBLEM IN THE HOIST MOTOR CONTROLS. THE CHIEF ELECTRICIAN WAS CALLED THE NEXT MORNING TO ASSESS THE SITUATION. THE ABB COMPANY WAS ALSO CONTACTED. THE ELECTRICAIN REPLACED A FUSE AND THE HOIST POWER CAME BACK ON AND IT STARTED RIGHT UP.