JUST PRIOR TO THE BLACKOUT OF NEW YORK, THE NO. 3 HOIST EXPERIENCED A POWER FLUCTUATION THAT TRIPPED IT OUT. WITHIN ONE MINUTE WE LOST ALL POWER. THE MINE WAS EVACUATED USING THE ""CHIPPY"" HOIS T AT THE #1 SHAFT, WITHOUT INCIDENT. POWER WAS RESTORED AT APPROX 9:30 PM AND THE #3 HOIST WAS RESET, UP AND RUNNING WITHOUT INCIDENT.