An air conditiioner contractor was working on the AC unit in the production hoist control room. When contractor re-energized the AC unit, several fuses in the production hoist control panel blew, causing the hoist to stop. The mine was evacuated. The fuses were replaced and the hoist was operational again at 5:20pm.