Sub-contractor was operating a company owned 50 ton haul truck. At the start of the shift he moved the haul truck with the bed in the raised position. The raised bed came into contact with overhead 15,500 volt high voltage power lines. (per call - driver told to remain in truck until power company arrived at 8:10 a.m to determine that power was off).