EE WAS PREPARING TO CLEAN UP SPILLED CEMENT AND SHOVEL INTO SCREW CONVEYOR. CONVEYOR TOP IS LEVEL WITH FLOOR. THE CONVEYOR HAD GRATING AND RUBBER BELT COVERING IT. EE MOVED BELTING, STEPPED INTO A 8"" OPENING THAT HAD BEEN LEFT, MOVED OUT OF POSITION.