While running the #1 production Hoist the hoist person experienced problems trying to pull a loaded skip up from the bottom. After powering the hoist up as much as 6 points the skip still wouldn't move so he shut the hoist down. U/G was evacuated. Down 1:22 am. Started running 3:22 am.