The contracted employee was installing 4"" PUC pipe in the splitter plant overhead from a man lift approx 12 ft above floor and 4-5 ft from ceiling. Throughout the installation procedure PUC glue and cleaner was used. All garage doors open in the building. He passed out, had a seizure, and transported to hospital by ambulance.