The #5 entry was driven in approx. 90'. Last 15' to 20' was unbolted. Midnight shift had dangered it off & reported that add'l bolting needed to be done outby the cut. Day shift was installing 10' bolts with straps 30' from fall area before it started working. Entire entry had been bolted with 5' & 6' full grouted 5/8 resin rods. Fall was approx 60' long x 10' high x 18' wide.