The # 1 Hoist was down due to a power failure at the Tri-State # 69 substation caused by a bad jumper. The power failure effected all of the Molycorp facility. All of the underground personnel were evacuated from the underground mine. Power was re-established at 9:11 AM. The hoist systems were checked and found OK.