A roof fall occured int he dump point cross-cut at 3&60 #2 west. The dump point being at 3 & 60 #5 west. the area was initially supported with 5' install iii bolts. Secondary support was added by installing 12' install ii long bolts. The roof fall exposed slick and sided rock at the anchor point of the long bolts. The roof fall topped out at this point.