Material in a cone discharge conveyor tailpully caused the belt to stop, the plant operator radioed ee to check out the belt. He climbed up on the plant grabed the drive belts to turn the conveyor backword by hand to clean the tailpulley out. As he did the plant operator started the conveyor.His thumb went arond the Vee Belt Pulley severing the tip of his thumb.