Minor went into inactive heading 3150 panel 48 to get ready to backfill. EE noticed left rib area getting loose. Notified shifter and area barricaded off. Day shift, foreman and engineer went to this area to investigate. Sometime between late nite and early day shift, there was a fallof ground from the left rib.