Roof fall occured out-by the working section at cross-cut 18+20. The fall was 100' in length crossing the #2W & #3W entries. Fall was 18'wide and 12' high. The area was initially bolted with 6' fully grouted rebar bolts with 10' cable bolts as secondary support. A slip was exposed at the top of the fall.