Process of rolling a tank to reposition. EE was told to move his chock since it was loose. There was a manway in center of the tank so had to put the forklift on the other end of the tank to releive pressue from bound end to remove that chock. At the same time the bound end had been freed the forklift was backing off tank to reposition. Tank rolled & pinned EE R Leg.