Roof fall on the Main Southeast between entries 4 & 5 at 14+70. The entries were bolted with 5ft grouted bolts and will not be cleaned up. The fall does not affect the passage of men or the mine's air course. The fall measured 25ft long and 18ft wide with a thickness of 10ft. Originally, developed 11/14/03.