4160x480 volt transformer secondary lug got hot. Wire burnt off and blew primary fuse; that in turn caused a surge in the system and faulted out the PLC chassis rack. This caused the PLC processor to fault. When spare processer was installed it faulted due to bad chassis rack, the crew was then brought out by manually operating work deck winch starters.