Lost power to whole mine and main hoist for 45 mins. Evacated employees to Main Shop per SOP. Troubleshooted the problem. Found bad 10 amp fuse for the main switch gear circuit board control. Called and left voice mail for Don Ratliff, MSHA Field Supervisor at 3:10 am and called back later when hoist was fixed at 3:30am.