After a pre-shift exam was made and prior to the face prep crew reaching the section at 12:10 AM, the crosscut 9 to 10 fell in. The fall was 20' wide x 40' long and 7' to 8' high. The area was supported with 6' fully grouted resin bolts and 2-12' cable bolts every 8'.