The #3 coal mill system went down loaded with coal due to a secondary firing fan motor failure at 7:45AM. The motor was replaced, and when the operator began to ""bump"" the coal mill empty several hours later an explosion occurred in the coal mill circuit causing the pressure relief explosion vent to rupture. No employee injuries or equipment damages occured.