Lightning strikes in the immediate area knocked out power to both #1 and #3 Hoists. An evacuationtion was ordered. #1 Hoist was returned to operational capacity and dressed for evacuation. #3 Hoist was returned to service shortly after and evacuation was no longer necessary, as all conveyances were operational.