At 2:25 pm Severe thunderstorms passed thru dumping heavy amounts of rain. At approximately 2:35 pm the Mine manager was notified of rising water in the sumps and the section was notified to deenergize power and head out of the mine. At approximately 2:45 pm water breached the return portal and started running into the Mine. Three MSHA inspectors were on site.