The mine experienced a roof fall at S.S. 1+50, entry #6 of the 1st East Panel, off the 1st North Panel. The fall measured 40' X 19.5' X 7', and occurred in a 4 way intersection. Fully grouted 6' roof bolts had been used as roof support, the area was developed on 7/6/2007.