Beginning on or about 9/11/07 we had a job loading 20,000 tons of a 2 x 8 inch rock. EE said the motion of his loader while loading that material made his upper back begin to hurt. He spoke of a ""whip"" as the bucket came back against the stops and having to stretch to operate the scale