As water receded in the old Northwest mains area during pumping efforts a roof fall was identified in the #8 and #9 entries near spad #4104 and #4109. The fall was approx. 40' long X 20' wide and approx.4' high. The area contained 4' resin and 4' dbl. lock bolts. The area was mined approx. 11/93. The area has been dangered off and timbers have been set.