An ice storm disrupted power to mine site at 1:10pm on 12/10/07. Power to fan and both hoists were lost. All personal underground traveled to the Elkhart portal and power from the back up diesel generator was used to bring all out from underground. Incoming power was restored at 5:00pm and the mine was reexamined and work resumed.