At 4:08 PM an interruption in the electrical supplyoccurred, which we believe was a surge in power and to which the power company said likely did happen. Result was damage to a circuit board panel in the DC converter of the hoist system. A new circuit board was flown in on 12/18/2007. Following hoist checks and inspections, the hoist was put back in service at 7:45 PM.