Subsequent to the completion of the shaft inspection, the main door of the #1 skip was left in the down position. The door blocked the capability for rock to enter resulting in muck buildup outside the door. The ship then became stuck. The hoist was down for approximately one hour while the muck was removed. There was no damage to the hoist system.