The mine encountered an unplanned roof fall on the 3rd Main Northwest, Entry #2, from 51+80 to 53+10. The fall measured 130' X 19' X 8' thick. The fall did not affect ventilation, or the passage of men, no equipment or injuries were encountered. The area was developed on 12/2006, supported with 8' point anchor bolts. The fall will not be cleaned up.