#3 Service hoist was overloaded when a heavy motor was placed in the cage for transport. The safety controls on the hoist prevented conveyance movement. The motor was removed, the cage and rope connections inspected, and a round trip shaft conveyance test successfully performed before the hoist was returned to service at 6:00 PM. The mine crew left the mine via the Decline.