An unintentional fall of roof occurred on the 2nd South panel, off the 2nd West Sub Main, off the 4th South Sub-Main in front of #4 seal. The area was bolted with 6 & 10 foot point anchor roof bolts. The roof was fractured stack rock. The fall will not be cleaned up. A seal plan will be sumitted for this area.