The Lilley controller lost syncronization with the PLC controller. The brake switch and Lilley controller was out of adjustment. The mine initated a routine evacuation due to temporary loss of secondary means of egress. MSHA was notified at 9:50pm. 23 people were underground at the time of the failure. The hoist was returned to service at 12:25am May 1st 2008.