Escape hoist for the alternate escapeway was being tested and stopped operating at approximately 7:00 PM; production was stopped and people pulled back, and was back operating at approximately 7:45 PM. It had a relay that was stuck. Day shift went back over the hoist 06/18/2008 to check it out.