A roof fall occurred 10,600 feet outby the working section in the #6 entry near spad # 485. The fall was 40' long and 18 feet wide and 5 feet thick. 4 ft 3/4 glue bolts and 12 ft. cable bolts had been installed in this area. This was a transitional area from sandstone to shale.