A fire started inside the gear drive for kiln #2. It was put out with CO2 fire extinguishers but continued to flare up. Fire was out at 1:40 pm but flared up at times after that. MSHA was notified via phone. An MSHA inspector arrived onsite between 3:30-4:00 pm.