#2 hoist conveyance did not fully open at dump. Conveyance became lodged in shaft dump area. Very minor damage to the skip door was incurred. Crews were removed to the 900 level where there is secondary egress. Skip was handmucked and is under repair. Secondary egress was re-established via #1 skip within 3 1/2 hours.