Fire started by a backdraft or chimney draw on 2 SDRII plastic pipes. One which was an 8"", was being moved and the opening of the 8"" plated. Fire was pulled up thru the 14"" & 8"" pipe as well. This is odd, but possible, so we have started the practice of removing the existing pipe when welding or cutting on the kill box,