Crew was flying in a piece of 8"" pipe with a 90 degree bend 18' X 18'. An initial pick was made and a decision to re-rig was made. The pipe was placed on a concrete slope 1:1. The pipe stayed in place momentarily and then slid down slope aabout 5 feet catching the injured between the pipe and a crane outrigger.