The fire boss found the roof fall on the South Mains B Section. The fall was approximately 80' x 16' x 13'. The cover was approximately 230' in the area of the fall, and the top was laminated shale and sandstone. Area was bolted with 6' fully grouted resin bolts with 12' cable bolts installed sporadically in the area. The fall occurred on an idle shift.