A roof fall occurred in the 2nd West Submain at spad number 5+90 in the pillar line between #8 and #9 entries measuring approximately 25ft. long x 18ft. wide x 7ft. to 8ft. high. This area was supported with 4 foot fully grouted roof bolts, 8 foot cable bolts and square cribs.