This was an extension of a roof fall that was discovered 10/15/08 on 2 South, #3 entry, #4 x-cut. The secondary escapeway was blocked, but it was re-routed to the #3 entry. The fall was approximately 40' x 30' x 10' thick. Area was mined August 2006, bolted with 6' fully grouted roof bolts. Initial fall had been timbered off.