# HOISTING
> MSHA accident `220100260018` · 01/23/2010 · Cargill Deicing Solutions
## Details
- **Degree of injury:** ACCIDENT ONLY
- **Classification:** HOISTING
- **Accident type:** Accident type, without injuries
- **Occupation:** —
- **Activity:** —
- **Injury source:** —
- **Nature of injury:** —
- **Body part:** —
- **Days lost:** 0
- **Mine experience:** — years
## Operator
- **Controller:** Cargill Inc
- **Operator:** Cargill Deicing Solutions
- **Mine:** [3301994](https://api.ai-analytics.org/mine/3301994)
## Narrative

West hoist motor was deenergized to replace brushes on the motor.  Upon reenergizing at 10:20 am, it was found that there was no power to the PLC controls.  Mine evacuation began and MSHA notified about 10:35am.  It was found that the uninterruptable power supply (UPS) was bad in the control power line.  This unit was replaced and the hoist was put back into operation at 10:55 a.m.

---