Mine examiner encountered a roof fall in the return entries (L3 & L2) just inby SS#5612 in 2-East off 1-Right section at appx 5:10 AM. The L2 entry was supported with 6' super twist bolts with T-5 channels and 12' cable bolts on 8' centers. The L3 entry was with 4' resin bolts and then center cribbed on 5' centers. The area was at the bottom of a dip in the coal seam.