The #3 production hoist tripped on ""Check Point UHM"" and ""Drive Converter A"" faults. Electrician was called out of the mine to inspect the hoist and reset the faults. The hoist was back in service at 4:40 PM. There were still two escapeways throughout the incident (#2 and #6 shafts).