At approximately 7:41am the rupture vents on the #2 coal system opened due to an ignition of coal dust inside the coal grinding circuit. Prior to the ignition the coal weigh belt stalled causing a reduced amount of coal feed into the grinding mill which resulted an elevated temperature at the mill exit. There were no personnel injuries or equipment damages.