Fire was reported to the control room at 7:02 AM. Employee access to the area was barricaded off. Flames were coming out of the inspection doors, second mezzanine level of the riser. Raw meal feed rate to the kiln was reduced, biosolids machine was started to reduce the flow of natural gas to the preheater. The fire was contained within the riser by 7:48 AM.